General Description of the Works
|
|
Route of the Line
|
|
Summary of Technical
Characteristics
|
|
500 kV Transmission
Line
|
|
Substations
|
| |
|
|
General
Description of the Works
The transmission system includes:
|
|
|
Three
500 kV transmission lines between the Yacyretá
Hydroelectric
Power station and
the Rincón de Santa María Substation, 4 km in lenght
each. |
|
|
Substation
and 500 kV yard at Rincón de Santa María,
province of Co-
rrientes. |
|
|
500
kV transmission line between the Rincón de Santa María Substation
and the Resistencia Substation, of 269 km in lenght.
In 1998 the line was sectionized to allow the linking with the Paso de
la
Patria Substation, located in the town of the same name in the province
of Corrientes. |
|
|
Expansion
of the Resistencia Substation, in the province of Chaco. |
|
|
Communication
System.
|
| |
|
|
| |
 |
| |
|
Click
the map to view an enhanced image
|
| |
|
|